Skip to main content
Loading…
This section is included in your selections.

(A) All cuts or excavations in the city streets, alleys, sidewalks or curbing shall be repaired according to the standards set forth in this subchapter and within a reasonable time after completion; and, if such person, firm or corporation shall fail to do so, after written notice by the city, the city may proceed to make such repairs and restore the street, alley, sidewalk or curbing and charge the same to the person firm or corporation responsible for the restoration of the street. The repairs will be charged at the prevailing rate at such time for such work in the city, plus an additional 10% fee to cover administrative cost.

(B) All portions of any cut which lie within the curblines of the street or actual traveled portion of the street as designated by the City Manager shall be backfilled with Class 2 material which complies with the Oregon State Highway Standard Specification, tamped to achieve uniform compaction. On streets having asphaltic paved and/or impregnated surfaces, a minimum of four inches of compacted hot-mix asphaltic concrete shall be placed in the upper portions of the pavement cut and be rolled and/or tamped to the grade of surrounding pavement The same standards shall be applied to the sidewalks; except, when the sidewalk is composed of poured concrete, the complete section of sidewalk, where cut, shall be replaced with concrete. (Ord. 2014-07, passed 11/10/2014)